Which CRO fixes to do first? Rank by cost, not prize
Your audit ranked 200 findings by what each one is worth. That still does not tell you what to do on Thursday. Rank by cost to ship instead, and here is the evidence for why.
"Two hundred findings. I get maybe three hours on Thursday."
So you need an order, and the report gave you one, ranked by what each finding is costing you. That is still not the answer. What a fix is worth and what it costs you to ship are two different numbers, and almost every prioritisation method gets the second one wrong in a documented direction. Rank by cost to ship. Then do three.
Why does a ranked report still leave you stuck?
Because a revenue ranking answers a question you did not ask. It tells you which finding is worth the most if fixed. It says nothing about which one you can finish before Thursday ends, and that second question is the one deciding what actually gets shipped.
The usual answer is a scoring framework. The best known in conversion work is PIE, created by Chris Goward at WiderFunnel: score each idea on Potential, Importance and Ease, then average the three. ICE swaps in Impact, Confidence and Ease. RICE divides by effort outright. All of them combine a judgement about value with a judgement about difficulty, which is correct in principle. The problem is how accurate each judgement turns out to be, because the research exists for both and does not say what the frameworks assume.
How often does a conversion fix actually work?
About a third of the time. Kohavi and colleagues at Microsoft, writing for KDD 2013, put it plainly: only one third of the ideas tested at Microsoft improved the metric they were designed to improve. Two thirds did nothing, or did harm. These were funded, reviewed, deliberate changes.
The paper publishes no count of experiments behind that one third, a real gap, so treat it as a signal of scale rather than a precise rate. Checking it was worth doing anyway: the most cited write-up credits the figure to Microsoft, Amazon and Booking.com together, where the paper says Microsoft.
Now the part the frameworks miss. A one in three hit rate is roughly the same on every row, so it is a constant, and a constant cannot reorder anything. It only tells you to expect two of three fixes to do nothing, which means you want more attempts, and cheaper ones.
You are not picking the winner. You are deciding how many guesses you can afford.
Worth knowing what your top three even are? Run a free audit and read only page one.
Which half of the priority score is actually wrong?
The effort half. Impact is the input everyone already distrusts, and the frameworks admit it. Effort gets treated as the easy call, the one a developer can eyeball. It is the one with decades of measurement against it, and the measurement is unkind.
Kjetil Moløkken-Østvold's 2004 doctoral thesis at the University of Oslo reviewed the survey evidence and found software projects overrun their effort estimates by 30 to 40% on average, with a majority, 60 to 80%, overrunning at all. His own fieldwork, structured interviews covering 52 projects across 18 companies, found overruns in 76% of them at an average magnitude of 41%.
- One third of tested ideas improved the metric they targeted, at Microsoft
- 30 to 40% average effort overrun across the surveyed projects
- 60 to 80% of projects overran their estimate at all
- 41% average overrun in 52 projects interviewed directly
Put both findings in one sentence and the arithmetic turns. Your value estimate is optimistic and your effort estimate is optimistic, in the same direction, so the score inflates at both ends. And the effort error is not a constant. Forty percent over on a one hour job costs you twenty four minutes. Forty percent over on a three week job costs you six working days. The percentage is flat, the damage is not, and your score sheet shows neither. That is the case for doing the cheap thing first, not as a compromise, but because the expensive row carries a risk the number beside it never mentions.
Which overrun number should you believe?
The 30 to 40% one. Moløkken-Østvold notes published averages running from 18% at the low end to the Standish Group's much quoted 89%, and says outright that Standish sits far above what other surveys find. The number to plan against is the middle of that range, not the headline at either end.
That spread is sampling, not noise. A survey that recruits troubled projects finds troubled projects. The thesis endorses neither outlier and reports the clustered middle, which is why we use his figure rather than the more quotable one. For that scepticism turned on euro estimates, we have written about where ours are softest. Founders say it more bluntly: "I had the list for four months and shipped one thing off it."
What goes in Thursday's three hours?
Three items you can finish, chosen by cost to ship, with the prize used only to break ties. Do all three in one sitting if they are genuinely small, then stop and watch what happens. Measuring is the reason for doing three rather than one.
- Take the top ten only. Below that is reference, not homework. We have argued that a report is one page plus an index.
- Price each one in hours, yourself. Not story points. Hours, by whoever will do it. Then add 40%, because that is what the evidence says you left out.
- Divide the euro figure by those hours. Euros per hour of work, sorted descending. That single column is the whole method.
- Ship the top three. If two score close, take the one you finish today.
- Schedule the big one, do not bin it. Next month, with a real estimate attached.
A worked row. Twelve thousand visitors a month, 1.4% buying, €68 average order. A headline rewrite priced at €740 a month against one hour of work scores €740 per hour. A checkout rebuild priced at €3,100 a month over three weeks, which the research says is four, scores near €19. The rebuild is worth four times more and ranks forty times worse.
Revslip's free-tier estimates come from traffic × CVR gap × AOV × mobile weight, published so you can run it by hand, and that is the numerator above. Across the 134 businesses audited so far, roughly 200 signals get checked, routed by business type. That sample leans one way: these are sites whose owners already suspected something was wrong.
The number we never put on a finding Revslip prices what a finding costs you in euros and bands the top three as quick wins from what the page itself shows. It cannot price the hours, because hours depend on your CMS, your developer, and whether anyone still has the theme files. So the denominator in the method above is the one number we hand back to you, and you should get it from the person doing the work before trusting any ordering, ours included.
Want the euro column filled in first? Start with a free audit, then add your hours.
When is the slow expensive fix the right call?
When the gap is an order of magnitude rather than a multiple. If one finding is worth twenty times the rest combined, euros per hour is the wrong sort, because no number of cheap wins reaches it. Fix that one and accept the calendar.
Two other cases. If a developer and a marketer have booked hours against the site, parallel work beats a sequenced three, and this method is built for the founder working alone. And if your traffic is too low for anything to be measurable for months, ordering is not your constraint, which is a separate problem with a separate answer.
Then check it moved. One change, one metric, a date written down beforehand. Tracking whether a fix worked is its own discipline, and skipping it means next Thursday looks exactly like this one.